• Multiple tests over multiple zones in multiple horizons were run at the Mopane-1X exploration well. The flows achieved during the well test reached the maximum allowed limits of 14 mboe/d. The flow rate was constrained by the size of the available surface facilities.
• The AVO-1 horizon encountered at Mopane-1X and Mopane-2X are in the same pressure regime, suggesting that the entire area (8 km diameter) between the two wells is connected. Overall, in the Mopane complex alone, and before dril ....
22 Apr 2024
Sintana Energy Inc. (TSX-V: SEI): Constrained test rate of 14 mboe/d at Mopane-1X. 10+ bn boe in place confirmed.
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Sintana Energy Inc. (TSX-V: SEI): Constrained test rate of 14 mboe/d at Mopane-1X. 10+ bn boe in place confirmed.
• Multiple tests over multiple zones in multiple horizons were run at the Mopane-1X exploration well. The flows achieved during the well test reached the maximum allowed limits of 14 mboe/d. The flow rate was constrained by the size of the available surface facilities.
• The AVO-1 horizon encountered at Mopane-1X and Mopane-2X are in the same pressure regime, suggesting that the entire area (8 km diameter) between the two wells is connected. Overall, in the Mopane complex alone, and before dril ....