AUCTUS PUBLICATIONS
________________________________________
Arrow Exploration (AXL LN/CN)C: target price of £0.65 per share: Flow rate of high impact horizontal well above expectations – The first CN Horizontal well (CNB HZ-1) from the Carrizales Norte B pad has been on production since 14 June at a rate of 3,150 bbl/d (~1.6 mbbl/d net) with less than 1% water cut while still recovering load fluid. The flow rate is currently constrained with the ESP operating on the minimum setting. The flow ra ....
![working](/images/WorkingLarge.gif)
21 Jun 2024
AUCTUS ON FRIDAY - 21/06/2024
Sound Energy plc (SOU:LON), 1.0 | UK Oil & Gas Plc (UKOG:LON), 0.0 | Maha Energy Ab (MAHAA:STO), 0 | Maha Energy AB Class A (MAHA.A:OME), 0 | Gulf Keystone Petroleum Limited (GKP:LON), 150 | Equinor ASA (EQNR:STO), 0 | Equinor ASA (EQNR:OSL), 0 | Energean Plc (ENOG:LON), 994 | Longboat Energy Plc (LBE:LON), 20.5 | DNO ASA Class A (DNO:OSL), 0 | DNO (DNO:STO), 0 | Caspian Sunrise PLC (CASP:LON), 3.2 | Aker BP ASA (AKRBP:OSL), 0 | Arrow Exploration Corp. (AXL:TSX), 0
![](/images/orange-lock.png)
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
AUCTUS ON FRIDAY - 21/06/2024
Sound Energy plc (SOU:LON), 1.0 | UK Oil & Gas Plc (UKOG:LON), 0.0 | Maha Energy Ab (MAHAA:STO), 0 | Maha Energy AB Class A (MAHA.A:OME), 0 | Gulf Keystone Petroleum Limited (GKP:LON), 150 | Equinor ASA (EQNR:STO), 0 | Equinor ASA (EQNR:OSL), 0 | Energean Plc (ENOG:LON), 994 | Longboat Energy Plc (LBE:LON), 20.5 | DNO ASA Class A (DNO:OSL), 0 | DNO (DNO:STO), 0 | Caspian Sunrise PLC (CASP:LON), 3.2 | Aker BP ASA (AKRBP:OSL), 0 | Arrow Exploration Corp. (AXL:TSX), 0
- Published:
21 Jun 2024 -
Author:
Stephane Foucaud -
Pages:
6 -
AUCTUS PUBLICATIONS
________________________________________
Arrow Exploration (AXL LN/CN)C: target price of £0.65 per share: Flow rate of high impact horizontal well above expectations – The first CN Horizontal well (CNB HZ-1) from the Carrizales Norte B pad has been on production since 14 June at a rate of 3,150 bbl/d (~1.6 mbbl/d net) with less than 1% water cut while still recovering load fluid. The flow rate is currently constrained with the ESP operating on the minimum setting. The flow ra ....